PHASE 1

Phase 1 produced and validated a draft MOPS of the RPS Core Layer, to be used as input to start standardisation activities at EUROCAE.

This phase involved

  • Generation of a generic MALE RPAS RPS architecture with the identification of the Core Layer elements, as per ICAO definition.
  • Assessment and consolidation of existing Airworthiness and Air Traffic Integration requirements.
  • Development of the required preliminary technical content for the MOPS.
  • Preliminary Validation of MOPS requirements.