PHASE 1
Phase 1 produced and validated a draft MOPS of the RPS Core Layer, to be used as input to start standardisation activities at EUROCAE.
This phase involved
- Generation of a generic MALE RPAS RPS architecture with the identification of the Core Layer elements, as per ICAO definition.
- Assessment and consolidation of existing Airworthiness and Air Traffic Integration requirements.
- Development of the required preliminary technical content for the MOPS.
- Preliminary Validation of MOPS requirements.