PHASE 1
Phase 1 produced and validated a draft MOPS of the RPS Core Layer, to be used as input to start standardisation activities at EUROCAE.
![civil-engineering-29](http://rpss.eda.europa.eu/wp-content/uploads/2023/08/civil-engineering-29.png)
![civil-engineering-32](http://rpss.eda.europa.eu/wp-content/uploads/2023/08/civil-engineering-32.png)
![box23](http://rpss.eda.europa.eu/wp-content/uploads/2023/08/box23.png)
This phase involved
- Generation of a generic MALE RPAS RPS architecture with the identification of the Core Layer elements, as per ICAO definition.
- Assessment and consolidation of existing Airworthiness and Air Traffic Integration requirements.
- Development of the required preliminary technical content for the MOPS.
- Preliminary Validation of MOPS requirements.